Bass 3 Giffintown Sur Le Canal
- Property type: Condos
- City: Montreal
- Developer: Musto Construction
- Status: Pre-Construction
- Category: Recently Launched , Special Incentives
Details
DEVELOPMENT INFORMATION:
Summary:
Bass 3 Griffintown Sur Le Canal is a new condo development by Musto Construction currently in preconstruction at Rue des Bassins & Rue du Séminaire, Montréal. Bass 3 Griffintown Sur Le Canal has a total of 246 units. Sizes range from 561 to 1241 square feet.
Development Name: Bass 3 Griffintown Sur Le Canal
Developer: Musto Construction
Address: 1400 Ottawa St, Montreal, Quebec
Main Intersection: Rue des Bassins & Rue du Séminaire
Number of Storeys: 8
Number of Suites: 246
Unit Types: Condo
Unit Size Range: TBD
Parking Price: TBD
Locker Price: TBD
Estimated Taxes: TBD
Estimated Maintenance: TBD
Estimated Parking Maintenance: TBD
Estimated Locker Maintenance: TBD
Estimated Occupancy Date: TBD
Deposit Structure: TBD
International Deposit Structure: TBD
Building Amenities: TBD
DEVELOPMENT HIGHLIGHTS:
- The neighborhood is home to mostly young professionals.
- With its recent revitalization, investors recognize Griffintown’s unlimited potential.
- World cuisine, beer-tasting bars, perfect for foodies and drinking enthusiasts.
- Located on the shores of the Lachine Canal and steps away from the Atwater market.
- Within walking distance of the city centre, its businesses, shops and the Old Port.
- Walk, cycle or kayak away from downtown.
- Conveniently located close to public transit (metro, bus, and future REM rapid transit system), plus all major highways.
PRICING: TBD
About the Developer:

With several condos and homes built in Montreal, the Musto reputation speaks for itself. The business is also accredited Platinum by the Garantie des Maisons Neuves de l’APCHQ, an important honour in the construction of new condos.
** WE DO NOT REPRESENT THE DEVELOPER **